Jeffrey Meehan/Pahrump Valley Times The Yucca Mucker (pictured) bore the tunnel for the proposed nuclear waste storage facility at Yucca Mountain. The tunnel spans five miles long and drilling was …

Jeffrey Meehan/Pahrump Valley Times
The Yucca Mucker (pictured) bore the tunnel for the proposed nuclear waste storage facility at Yucca Mountain. The tunnel spans five miles long and drilling was completed in 1997 at Yucca Mountain, which sits near Mercury.